The automatic railway gate controller detects when train is coming and has pass the railway gate. This controller uses IR sensors to perform following two tasks
- When train is coming. Detect and close the gate
- When train has passed. Detect and open the gate
Project Model Picture
A L293D H-Bridge is used to control gates connected to a motor. The following video demonstrate the working of the project